  • A complete quote names the exact furnace (brand, model number, AFUE, input BTU, stages, blower), shows how it was sized and lists every part of the job.
  • Ontario installed ranges, before 13% HST: $4,000 to $6,500 single-stage, $5,500 to $8,000 two-stage, $7,000 to $11,000 modulating.
  • Most often missing: the heat loss calculation, venting details (including a water heater chimney liner), condensate, permits and warranty terms.
  • Compare quotes before HST and on the same scope. The higher number can be the better deal if it includes more of the work.
  • Get the deposit, payment schedule, price validity and install date in writing before you sign.

Whether it comes from a FurnaceQuotes.ca request or from a company you found yourself, a furnace quote is a scope of work with a price attached, and the price only means something if the scope is complete. So the first job is not to look at the total. It is to check that every part of the install is written down. Below: an annotated sample, a printable checklist, and a short section on each line covering what it should say and what it usually costs.

A sample furnace quote, annotated

A complete quote for a two-stage furnace in a 1,900 sq ft Kitchener home could look like this. The numbered notes explain each line.

Sample Heating Co.

TSSA registration no. listed here

Estimate 1042

Valid 30 days

Prepared for: sample homeowner, Kitchener ON

  1. Two-stage gas furnace, 96% AFUE, 60,000 BTU input, ECM blower. Brand and model number listed$5,890
  2. Heat loss calculation (CSA F280), 1,900 sq ftIncluded
  3. New PVC intake and exhaust venting, sidewall termination$480
  4. Condensate line to floor drainIncluded
  5. Supply and return plenum transitions, sealed$560
  6. Programmable thermostat, installed and set up$240
  7. Permits where required, gas line pressure test$150
  8. Remove and dispose of old furnaceIncluded
Subtotal
$7,320.00
HST 13%
$951.60
Total
$8,271.60

Warranty: 10 years parts with registration, 2 years labour. Deposit 10%, balance on completion. Install within 2 weeks of signing.

  1. 1

    The exact equipment

    Brand, model number, efficiency (AFUE), input BTU, stages and blower type. Without a model number you cannot compare quotes like for like.

  2. 2

    How it was sized

    A room-by-room heat loss calculation (CSA F280), not "same size as the old one". Oversized furnaces short-cycle and wear faster.

  3. 3

    Venting

    High-efficiency furnaces need their own PVC venting. The quote should say the material, the route and where it exits the house.

  4. 4

    Condensate

    Where the water from the furnace goes. If there is no floor drain nearby, a condensate pump should be listed.

  5. 5

    Duct connections

    New furnaces rarely line up with old ducts. Transitions and sealing belong on the quote, not on a later invoice.

  6. 6

    Thermostat

    A named model, or a clear note that your existing thermostat will be reused.

  7. 7

    Permits and gas work

    Who arranges any permit, and that gas work is done by a TSSA-registered contractor. Ask for the registration number.

  8. 8

    Removal

    Haul-away of the old unit is often included. If it is not, it should be a line item.

  9. 9

    Warranty, deposit and timing

    Parts and labour years (they differ), any registration needed, the deposit, the payment schedule, the install date and how long the price holds.

Sample quote for illustration. The company and figures are made up but sit inside typical Ontario ranges (two-stage furnace $5,500 to $8,000 installed, before HST).

Want a quote written like this for your home?

Get A Free Quote

The furnace quote checklist

Use this list on every quote, and ask for any missing line in writing before you compare prices. Print it to tick off up to three quotes, or use the quote comparison worksheet.

Furnace quote checklist: 15 lines

Furnace quote checklist

furnacequotes.ca/quote-guide/what-a-furnace-quote-should-include/

  • Brand and full model number, with AFUE, input BTU, stages and blower type
  • A heat loss calculation (CSA F280) and the furnace output it points to
  • Venting: pipe material, route, where it exits, and any chimney liner for the water heater
  • Condensate: a line to a floor drain, or a condensate pump
  • Supply and return connections, sealed, plus any priced duct changes
  • Thermostat: the model, or a note that yours is reused
  • Gas connection, shut-off valve and a pressure or leak test
  • Permits: whether one is needed, who gets it and the cost
  • The company's TSSA registration number
  • Removal and disposal of the old equipment
  • Warranty: parts, heat exchanger and labour years, and who registers it
  • Price before HST, the 13% HST and the total
  • Deposit, payment schedule and how long the price holds
  • Install date and how long you will be without heat
  • What is not included, in writing

The exact equipment and model number

The quote should name the brand and full model number, plus the efficiency, input capacity, stages and blower type. "High-efficiency 96% furnace" is a description, not a specification. The model number lets you read the spec sheet, compare quotes like for like and confirm the unit installed is the one you paid for.

What each spec on a furnace quote tells you.
On the quoteWhat it tells you
AFUE, e.g. 96%The share of gas that becomes heat over a season. Most new gas furnaces made for Canadian homes since July 3, 2019 must reach at least 95%, so "high efficiency" alone says little.
Input BTU, e.g. 60,000Gas burned per hour. Heat delivered is input times AFUE: 60,000 at 96% gives about 57,600 BTU/h.
StagesSingle-stage always runs at full fire. Two-stage spends most of the winter on low fire. Modulating adjusts in small steps.
Blower typeAn ECM (variable-speed) blower uses less electricity and runs quieter than an older PSC motor.

Stages and blower type move the price most. Typical installed ranges in Ontario:

Single-stage gas furnace (95 to 96% AFUE)
$4,000 to $6,500
Two-stage gas furnace (96% AFUE, ECM blower)
$5,500 to $8,000
Modulating gas furnace (97 to 98% AFUE, variable-speed blower)
$7,000 to $11,000

Typical Ontario prices in CAD, before 13% HST. Reviewed October 2026. Ranges, not quotes.

If a new air conditioner is included, the outdoor unit and indoor coil should be listed by model number too, with the AHRI reference number that shows they are a certified match.

How the furnace was sized

A good quote says how the size was chosen, and the right answer is a heat loss calculation. In Canada that is CSA F280: a room-by-room method that accounts for walls, windows, insulation, air leakage and the local design temperature. The quote, or a sheet attached to it, should show the calculated heat loss in BTU/h and the furnace output picked to match.

"Same size as the old one" is not a sizing method. Many older furnaces were oversized from the start, and most homes have since gained better windows and insulation. An oversized furnace runs in short bursts, swings the temperature and wears faster. A rule of thumb shows why guessing fails: at 25 to 45 BTU/h per sq ft, a 1,900 sq ft home could need 47,500 to 85,500 BTU/h, a spread covering several furnace sizes. Our load calculation guide explains what gets measured.

Venting and the chimney

The quote should state the vent material, the route and where the pipes leave the house. High-efficiency furnaces vent through plastic pipe (PVC or another manufacturer-approved material), usually out a side wall. The gas code (CSA B149.1) and the manufacturer set clearances from windows, doors, the gas meter and the snow line, so the route can be longer than you expect. "Venting as required" leaves all of that open.

The line people miss most is the chimney. If the old furnace shared a chimney with a gas water heater, the water heater is left alone in a flue sized for two and may not vent properly. The usual fix is a chimney liner. The quote should include one, or state that the venting was checked and nothing is needed. Budget $300 to $1,500 more when new venting or a liner is needed.

Where the condensate goes

A high-efficiency furnace makes water whenever it runs, and the quote should say where it goes. The simple case is a short line to a floor drain. If the drain is far away or higher than the furnace, you need a condensate pump, typically $150 to $350. Check that any line near an outside wall is protected from freezing. Some installers add a neutraliser for the slightly acidic water.

Duct connections and return air

A new furnace rarely lines up with the old ducts, so the quote should include sealed supply and return transitions. That sheet-metal work is part of a normal install and belongs in the price, not on a later invoice.

Return air is worth asking about. Many older homes have too few or too small returns, which makes a new blower loud and less efficient. A careful estimator checks the ducts and may measure static pressure. Changes such as a new return or a media filter cabinet should be separate priced lines, typically $500 to $3,000+.

The thermostat

The quote should name the thermostat or say your existing one will be reused. Either is fine; the problem is silence, which leaves you assuming a new one. Match matters: a two-stage furnace works best with a two-stage thermostat, modulating furnaces often need the manufacturer's own control to use their full range, and many smart thermostats need a common wire. A new thermostat typically adds $150 to $600.

Permits and gas work

A complete quote says whether a permit is needed, who gets it and what it costs, and it covers the gas work: the connection, a shut-off valve where required, and a pressure or leak test. Permit rules vary by municipality. Where one applies, it typically costs $75 to $300. Gas line changes beyond the connection run $300 to $1,200.

Gas work in Ontario

In Ontario, only a TSSA-registered contractor, using certified gas technicians, may install or repair gas appliances. Ask for the company's TSSA registration number and the technician's certificate before work starts. We do not certify, license or inspect any company.

The company's TSSA registration number should be on the quote; you can confirm it in TSSA's public fuels contractor registry. Ask for the startup readings too (gas pressure, temperature rise, combustion results), which show the furnace was set up to the manufacturer's specification.

Removal and disposal

Hauling away the old furnace is often included, and the quote should say so. If an old air conditioner or coil comes out as well, its refrigerant has to be recovered by a qualified technician first. If either is extra, it should be a priced line.

Warranty: parts, labour and registration

The quote should list three warranties separately, because they come from different places and are often confused:

  • Parts come from the manufacturer. Ten years is common, often only if the furnace is registered within a set window after installation, commonly 60 to 90 days.
  • The heat exchanger often has longer coverage, sometimes 20 years or lifetime.
  • Labour comes from the installer and varies from one year to ten. A parts warranty does not pay for the technician's time.

Ask who registers the furnace and to send you the confirmation. Keep the invoice and maintenance receipts, since some warranties ask for proof of regular maintenance.

The price breakdown and HST

The quote should show a subtotal, the 13% HST and the total, and make clear which numbers include tax. A single package price is fine as long as every part of the scope is written down. Our ranges are before HST. When one quote includes HST and another does not, divide the tax-included price by 1.13 before comparing. It can flip which one is cheaper:

Two quotes for the same job, put on the same basis. Figures are illustrative.
QuoteAs writtenBefore HSTHST (13%)Total
Quote A$7,320 plus HST$7,320.00$951.60$8,271.60
Quote B$8,150, HST included$7,212.39$937.61$8,150.00

Quote B's headline is $830 higher, yet it costs $107.61 less before tax. Once both are on the same basis, check them against typical ranges with the quote checker.

Only have one quote? Get a second written quote for the same scope to compare.

Get A Free Quote

Deposit, payments, validity and install date

Before you sign, the quote should state the deposit, when the balance is due, how long the price holds and when the work happens. Those four lines protect you more than any discount.

  • Deposit. A modest deposit to order equipment is normal (the sample asks 10%). Paying most of the price up front puts the risk on you.
  • Payment schedule. The balance should be due once the furnace is installed and working.
  • Validity. How long the price holds, for example 30 days. A price that expires today is a pressure tactic.
  • Install date. A target date and how long you will be without heat. Most straight replacements take about a day.

If you sign in your own home, Ontario gives you a 10-day cooling-off period from the day you receive a written copy (see the province's rules for contracts signed at home). If you finance, the agreement should show the interest rate and total cost of borrowing; see financing versus renting.

What is not included

A good quote lists its exclusions, because those turn into change orders on install day. The usual ones:

  • Electrical work beyond reconnecting the furnace, such as a new circuit.
  • Drywall, painting and finishing where a finished basement has to be opened up.
  • Ductwork beyond the transitions: new runs, extra returns or zoning.
  • The air conditioner coil. If you keep your AC, the old coil may not fit the new cabinet. Ask how it will be handled.
  • Hidden conditions such as suspected asbestos on old duct wrap, which needs a specialist.

Typical extras and what they cost

Many homes need none of these. When one appears on a quote, this is the usual Ontario range:

Venting changes or a chimney liner
$300 to $1,500
Condensate pump
$150 to $350
Duct changes
$500 to $3,000+
Thermostat replacement
$150 to $600
Permit fee (municipal)
$75 to $300
Gas piping
$300 to $1,200
Haul-away of the old equipment
Often included

Typical add-on prices in Ontario, before HST. Reviewed October 2026. Only some homes need each item.

Before you sign

Once a quote passes the checklist, scan it for furnace quote red flags, run the price through the quote checker, and bring our questions to ask before signing to the estimate. For a second quote on the same scope, request a furnace replacement quote. More guides are in the Quote Guide.

Common questions

Straight answers. If yours is not here, the company can answer it during your free estimate.

Should a furnace quote include the model number?

Yes. The brand and full model number let you check the efficiency, capacity, stages and warranty, and compare quotes like for like. Without it, "96% high-efficiency furnace" could mean several models at very different prices, and you have no way to confirm the unit installed is the one you paid for.

Are furnace quotes in Ontario before or after HST?

Either, so check. Many contractors quote before the 13% HST and add it on the invoice; others quote a tax-included total. To compare a tax-included price with one before tax, divide it by 1.13. The typical ranges on this site are all before HST.

What is usually not included in a furnace quote?

Electrical work beyond reconnecting the furnace, drywall and finishing, ductwork beyond the connections, and hidden conditions such as suspected asbestos are common exclusions. A chimney liner for the water heater and a condensate pump are sometimes left out too. A good quote lists its exclusions in writing.

How long is a furnace quote valid?

It varies, which is why the quote should say. Thirty days is common, and some companies hold prices longer outside the busy season. A price that is only good today is a pressure tactic. If your quote has expired, ask for an update in writing before you sign.

Is it normal to pay a deposit for a furnace install?

A modest deposit on signing, often used to order the equipment, is normal. The balance should be due once the furnace is installed, started and working. Be cautious about paying half or more before any work begins, and make sure the deposit amount and payment schedule are written on the quote.

Want a complete quote to compare?

Request a written quote for your home. A participating local HVAC company visits, checks the venting and ducts, and gives you a quote you can hold against this list.

Get A Free Quote

Takes under a minute. No cost, no commitment.